BIDR MTM SF EXP 12750 Train Schedule

Mon,Tues,Wed,Thur,Fri,Sat,Sun
Bidar to Machelipatnam
Station Halt Arrival Departure Day
(0 km)
0 min
First
19.35
1
(32 km)
1 min
19.49
19.50
1
(91 km)
2 min
20.43
20.45
1
(140 km)
1 min
21.29
21.30
1
(163 km)
10 min
22.10
22.20
1
(246 km)
1 min
23.24
23.25
1
(295 km)
1 min
00.09
00.10
2
(305 km)
2 min
00.23
00.25
2
(365 km)
1 min
01.14
01.15
2
(389 km)
1 min
01.29
01.30
2
(412 km)
1 min
01.49
01.50
2
(496 km)
1 min
03.44
03.45
2
(512 km)
15 min
04.15
04.30
2
(556 km)
1 min
05.19
05.20
2
(567 km)
1 min
05.31
05.32
2
(582 km)
1 min
05.44
05.45
2
(592 km)
0 min
06.20
Last
2

Bidar to Machelipatnam BIDR MTM SF EXP 12750 timing

BIDR MTM SF EXP (12750) runs from Bidar to Machelipatnam. It departs from Bidar station (BIDR) at and arrives at Machelipatnam station (MTM) at . BIDR MTM SF EXP takes 10.45 hrs to cover the distance of 592 km between Bidar and Machelipatnam. It is a non-superfast train. The average speed of this train is 55 kmph.